How long does it take to get a RPA I Ecocor Model home?

Price:

Once you sign a contract and your model home is in the production schedule, it takes between 2 to 3 months for the Ecocor prefabrication facility in Searsmont, ME to manufacture, deliver, and assemble your model home, provided the site preparation is complete. The foundation can be installed concurrently with the fabrication of your new home, drastically reducing the total construction time Once the model home is set by Ecocor, your home is ready for mechanical, electrical, plumbing, interior and exterior finishes.